NEWS
PRACTICE
CONTACT
CULTURE
LIVING
BUSINESS
EDUCATION
CLIENTS
 
 
BRITISH EMBASSY, Yemen
ARMED FORCES MEMORIAL, Staffs
AVENHAM PARK PAVILION, Preston
BOAT CLUB, Oxford University
CASTLE LANE CULTURE QUARTER, Bedford
COLOUR FACTORY, Winchester
CULTURE CENTRE, Sittingbourne
EASTGATE, Chichester
LIGHT AT THE END OF THE TUNNEL
MARITIME STADE, Hastings
PERFORMANCE GYM UoW, Winchester
PRIDDYS HARD, Gosport
PROTOTYPE BIRD BOX
RIVER HULL FOOTBRIDGE, Hull
STRIPE THEATRE UoW, Winchester
THEATRUM GEDANENSE, Poland
UNIVERSITY CENTRE UoW, Winchester
VISITBRITAIN, Singapore
VISITOR CENTRE, Hardwick Park
VISITOR CENTRE, Warwick
 

 

THE UNIVERSITY OF WINCHESTER, Performance Gym

  Client The University of Winchester
  Construction cost £650,000 Completion 2004

This project involves the conversion of a tired 1970’s gym into a dance studio. A black box or ‘performance gymnasium’ is placed centrally in the existing volume to allow circulation and ‘stage entrances’ around the edge. Above, a service gantry gives full control of lighting for the various uses of the space: teaching, rehearsal and performance. The project was designed and delivered on a fast-track contract over the summer vacation to minimize disruption to the University curriculum.

   
Overview Design Team